Procedure
The following test procedure must be followed every time:
- A board is soldered
- A chassis structure or support material is machined and is being test fitted with another component
- A major orbital mechanics simulation is run
- A major software test is run
- A major thermal simulation is performed
- A vibe test is done
- A TVAC test is done
- A radiation test is done
- Other important tests are performed
- Create a copy of the Testing Documentation Template
- Before performing these tests, fill out the purpose, test procedure, and metrics sections of the template.
- After performing the test, fill out the other sections.
If the test involves more than one subteam, place the document in the tests folder under Integration Documentation.